What it costs to finish a kit hut

The honest total, line by line, and where the money goes.

Updated 23 October 2026

A rustic window with a potted plant on the sill and fields beyond

The short answer: for a self-built 4.8m hut with a rolling chassis, fixings, insulation, electrics, cladding and paint, most people finish for about £12,000 to £14,000. Add a stove and a shower room and the 5.4m lands between £14,000 and £18,000. The kit is the biggest line, and the rest is your choices.

Line by line, 4.8m hut

ItemWhoBudget
The Suffolk (4.8m) kit, French doorsUs£7,250
Rolling chassisUs£1,950
Fixings packUs£180
DeliveryUs, by postcode£250 to £450
Insulation, 50mm PIR, floor, walls and roofBuilders' merchant, to our cut list£500 to £800
External cladding and battensTimber merchant, your choice of board£600 to £1,400
Electrics: cable from the house, consumer unit, lights, sockets, certificateElectrician£800 to £1,500
Paint, oil, sealant, stepsYou£250 to £500
Typical total£11,800 to £14,000

Our prices are guide prices; your exact quote comes by email before you order. The other lines are budgets to plan with; your own quotes will differ by area and by what you choose.

The extras people add

Where you save and where you shouldn't

Save on cladding (featheredge is cheaper than larch and looks right on a hut), on paint (one good exterior eggshell, not a designer tin), and on the base (sleepers and pads if the hut won't move). Don't save on insulation, on the electrician's certificate, or on the stove installer: those are the three things that make a hut comfortable and safe.

Against a finished hut

The same 4.8m hut bought finished from a UK maker is listed at £20,000 to £40,000 depending on spec (see our costs guide and makers list). The gap is your own time. See kit or finished hut for who should buy which.